Production planning and capacity
Job sequence by due date, raw material and line capacity; loading visible with line width, thickness and speed limits.
INDUSTRY · STEEL PRODUCTION & METAL PROCESSING
OCTO ERP built for steel businesses: production planning and capacity, work order tracking, heat number and batch traceability, scrap, offcuts and tonnage-based cost.
WHAT YOU MANAGE
Job sequence by due date, raw material and line capacity; loading visible with line width, thickness and speed limits.
Rolling, drawing, cutting, welding and coating steps; tonnage, scrap and downtime from the line on barcoded forms.
The heat number is recorded at intake; every product carries its heat, batch and lot.
Incoming, in-process and final inspection; test results, certificates and nonconformities on the product record.
Edge, end and processing scrap per work order; scrap tonnage by type in stock and costing.
Real cost per tonne by raw material, line, labour, outsourcing and scrap.
Raw material, semi-finished and finished stock in kg by grade, size and location.
Quotes and orders by tonnage; purchasing and shipment linked to the same order. Weighbridge and accounting connections assessed per project.
FLOW
Order: size, grade, tonnage and due date
Material: intake with heat number and certificate
Plan: job sequence by line capacity
Production: tonnage, scrap and batch record
Quality: tests, certificates and nonconformities
Shipment: packs, delivery note and cost report
RELATED TOPICS
ERP built for steel businesses: production planning and capacity, work order tracking, heat number and batch traceability, quality control, scrap and offcuts, tonnage-based cost.
Sales, purchasing, stock, production, quality and shipment in the language of steel production; tonnage, heat and certificate on every record.
Rolling, drawing, cutting, welding and coating operations on work orders; progress by line and shift.
From raw material intake to finished goods shipment; tonnage-based stock and cost.
Cutting, drilling, bending and welding steps in the product tree; material needs per order.
Product trees, work orders, traceability and cost for metal processing and machinery. Machinery & Valve Manufacturing →
Production records from the line with OCTO Mobile; tonnage, scrap and downtime on the same work order.
Job sequence by due date, raw material and line capacity; shortages become purchase requests.
Capacity by line width, thickness and speed limits; loading and due-date clashes visible in planning.
Which line and operation a work order is on; tonnage and scrap entered on barcoded forms.
Forward and backward tracing from raw material batch to finished goods shipment.
The heat number is recorded at raw material intake; every product made from that material carries it.
Stock, production and shipment by batch and lot; the batch behind a complaint found in one query.
Incoming, in-process and final inspection; certificates, test results and nonconformities on the product record. Quality Management (QMS) →
Edge, end and processing scrap per work order; scrap rates reported by line and product.
Scrap tonnage recorded by type; sale or recovery movements alongside stock.
Real cost per tonne by raw material, line, labour, outsourcing and scrap.
Raw material, semi-finished and finished stock in kg by grade, size and location.
Coil slitting and cut-to-length, coil and certificate traceability on a separate page. Steel Service Centres & Sheet Processing →
RELATED SOLUTIONS
From order to production and shipment.
Explore the solutionField-integrated quality, line to audit.
Explore the solutionEquipment, owners and movements.
Explore the solutionMany sources, shared reports.
Explore the solutionOperations such as rolling, drawing, cutting, drilling, bending, welding and coating are defined in the product tree; your line and operation structure is mapped during set-up.
Weighbridge and machine connections are assessed per project, based on your hardware and connectivity.
Tonnage-based stock and cost, heat number and certificate traceability, planning by line capacity and scrap tracking need later customisation in standard ERPs; in OCTO this structure is built in the language of steel production.
Heat number and certificate are recorded at raw material intake; production work orders are linked to that material. The heat, test and certificate history of a shipped product is reached from one record.
Scrap and offcuts are recorded per work order; cost per tonne shows material loss and scrap value together.
ERP, manufacturing, customer management or a process unique to your business. Tell us what you need and let’s find the right starting point.